Our Mission

  1. Preparation of investment program.
  2. To prepare the approximate cost calculations of the approved projects.
  3. Tender preparations and realization of the tender process.
  4. To ensure the distribution of appropriations.
  5. To prepare the projects of buildings and facilities within the scope of investment projects.
  6. To determine the materials to be used in these projects and to prepare the necessary detailed studies.
  7. To make the surveys of the buildings to be renovated and to prepare the modification projects with user approval.
  8. Controlling and approving the projects prepared outside of its structure, making the necessary revisions.
  9. Planning the buildings and facilities within the scope of our university's investment programs.
  10. To determine the landscaping works of open spaces for the future.
  11. To store and update information about all the land and buildings of our university.
  12. To ensure that the buildings and facilities are constructed in accordance with the technique.
  13. To supervise the full implementation of work and worker safety measures.
  14. To ensure the order of the construction site. To ensure controlled stockpiling of construction materials and wastes in order to maintain campus order.
  15. To prepare and realize annual and monthly work programs in line with the annual allowance.
  16. To prepare monthly progress payments and submit them to the progress payment examination unit.
  17. To make provisional and final acceptance procedures.
  18. To analyze the productions whose unit price is not known.
  19. To prepare time extension decisions.
  20. Preparing discovery boosts.
  21. To carry out the maintenance and repair of all heating, ventilation, sanitary systems, civil works, electrical installations, elevator systems in the buildings that have been put into service and to fix the malfunctions.
  22. To meet these requirements of systems that require regular maintenance and control in a timely manner.
  23. Preparing the ready-made constructions in our campuses in accordance with the country coordinates
  24. Following and finalizing the zoning practices of our university campuses.
  25. Issuing construction permits and obtaining, following and finalizing construction permits for all constructions to be started in our campuses.
  26. To carry out and follow up the works and transactions with the Municipalities, Land Registry Guards and Revenue Offices that our campuses are related to.
This content was issued on 11.10.2022 and has been viewed for 822 times.